Duane Buziak

Duane Buziak
Mortgage Maestro | NMLS #1110647 | Coast2Coast Mortgage LLC
Licensed mortgage broker serving Virginia, Florida, Tennessee, and Georgia, specializing in VA home loans and first-time homebuyer programs.

A land and construction loan combined finances the lot and the build under one loan and one closing, so you qualify once, pay one set of closing costs, and don’t have to refinance into a mortgage when the house is finished. The structure is simple, but the details (draws, interest-only payments, rate locks, as-completed appraisals) decide whether it works for you. Duane Buziak explains below how it works, what it costs, who qualifies, and how he shops it across hundreds of wholesale lenders instead of one bank’s single rate sheet.

Written by Duane Buziak, NMLS #1110647 | Coast2Coast Mortgage LLC NMLS #376205

How One Loan Covers the Lot and the Build

A land and construction loan combined goes by several names: single-close, one-time-close, or construction-to-permanent. The mechanics are the same. One loan funds the land purchase, pays your builder in stages as work is completed, and then converts to a permanent mortgage without a second closing or a second round of underwriting.

The alternative is the two-loan path, which can quietly become three loans:

  1. A lot loan to buy the land, with its own application, appraisal, title work, and closing.
  2. A separate construction loan to pay the builder, with another underwriting review, another appraisal, and another closing.
  3. A permanent mortgage when the house is done, often with a third set of fees if the construction loan doesn’t convert on its own.

Each step repeats costs and repeats the risk that your income, credit, or the market changes between approvals. A single-close loan locks in the approval up front.

Two phases, one note

The loan runs in two phases. During construction, you make interest-only payments on the money that has actually been disbursed. When the home passes final inspection and a certificate of occupancy is issued, the loan converts to a standard fixed-rate or adjustable-rate mortgage, and you begin paying principal and interest.

What “combined” does not mean

Combined does not mean the full amount lands in an account at closing. The land purchase is funded at closing, but the construction portion stays with the lender and is released to the builder in inspected draws as work is finished. You never receive the build money and hand it over yourself, and the lender doesn’t pay for work that hasn’t been verified.

Your lender will also want a signed contract with a builder, a set of plans, and an itemized budget before closing. Those documents define how much of the loan is available for each stage.

The Construction Draw Schedule, Step by Step

Draw schedules vary by lender and builder, but most follow the same sequence. The land closes first, then the builder submits a draw request at each milestone, an inspector confirms the work, and the lender releases that portion.

  1. Closing: The lot is purchased, and any initial builder deposit or site-work funds are released as allowed.
  2. Foundation: Footings, slab or foundation walls, and site preparation are completed and inspected.
  3. Framing: Structure, roof deck, and exterior sheathing go up.
  4. Mechanicals: Plumbing, electrical, and HVAC rough-ins are done.
  5. Finishes: Drywall, cabinetry, flooring, fixtures, and exterior work are completed.
  6. Final: The last draw is released after final inspection and the certificate of occupancy.

Why payments rise during the build

You pay interest only on the amount drawn so far. In the early months, when only the lot and a foundation have been funded, your payment is small. As each draw is released, the balance grows and so does the payment. Budget for the final-stage payment, not the first one.

Timeline and rate lock

Many custom and semi-custom builds take somewhere in the range of six to twelve months, and weather, permitting, and material delays can stretch that. Ask every lender how long the rate lock lasts, whether it covers the full construction period, and what an extension costs if the build runs long. Some products lock the permanent rate at closing, some allow a float-down, and some price extensions as a fee or a rate adjustment. Terms vary by lender, so get them in writing.

The contingency reserve

Many lenders require, or strongly encourage, a contingency reserve built into the budget, commonly a percentage of the construction cost. Its purpose is to cover overruns: a rock layer discovered during excavation, a price increase on lumber, or a change order you decide to make. Unused contingency typically is not paid out as cash, so treat it as insurance rather than spending money.

Who Qualifies: Credit, Down Payment, Builder, and Plans

A construction loan underwrites three things at once: you, your builder, and the project. Your income, assets, and credit are reviewed as with any mortgage. The builder is reviewed for license, insurance, experience, and financial standing. The plans, specifications, and budget are reviewed, and the appraiser values the finished home “as completed,” meaning what the property will be worth once the work is done.

Land you already own

If you own the lot free and clear, its value can typically count toward your down payment. Suppose you own land appraised at $75,000 and the finished project costs $450,000 including the lot. That equity would cover a 10% down payment of $45,000 with room to spare, and lender rules determine how much counts. If you still owe money on the land, the loan usually pays it off and only your net equity counts.

Program options

Conventional, FHA, and VA construction-to-permanent products exist, but availability, credit minimums, and down payment rules vary widely by lender, and some lenders don’t offer one or more of them. Verify current guidelines as of 2026 before you plan around a program. For veterans, VA.gov’s home loan page explains basic eligibility, though many lenders layer their own requirements on top.

Loan size matters too. The FHFA set the 2026 baseline conforming loan limit at $832,750 for most of the country, with a ceiling of $1,249,125 in high-cost areas, per the FHFA’s 2026 announcement. Loans above the applicable limit are jumbo loans with different pricing and guidelines.

NoTouch Credit

Duane Buziak can pre-qualify you through NoTouch Credit, a soft pull with no hard inquiry, so you can test the numbers on a lot and a build before committing to anything. Many single-shelf retail lenders require a hard pull to issue a pre-approval, which can matter if you plan to compare several options. Pre-qualification on a soft pull shows your likely loan options, and a full application later follows standard underwriting.

A Worked Example: Combined Loan vs. Two Separate Loans

Everything below is hypothetical and for illustration only. These rates and fees are not a quote or an offer, and actual closing costs depend on the lender and loan.

Suppose a buyer purchases a $75,000 lot and contracts a $375,000 build, for $450,000 total. With 10% down ($45,000), the loan is $405,000. Assume an illustrative 6.50% rate for both the interest-only and permanent phases, and for simplicity assume draws reach 25%, 50%, and 100% of the loan balance.

Interest-only payments during construction

  • 25% drawn ($101,250): $101,250 x 6.50% / 12 = about $548 per month.
  • 50% drawn ($202,500): about $1,097 per month.
  • 100% drawn ($405,000): about $2,194 per month.

After conversion, a 30-year fixed payment of principal and interest on $405,000 at 6.50% is about $2,560 per month, before taxes and insurance.

One closing vs. two

Assume a single-close loan carries $8,000 in total closing costs: $900 appraisal, $1,800 title, $4,050 origination (1%), and $1,250 in other fees. On the two-loan path, add a separate lot-loan closing: $600 appraisal, $1,200 title, $675 origination (1% of a $67,500 lot loan), and $750 other, or $3,225. The second closing still costs about $8,000. Total: roughly $11,225 versus $8,000, about $3,225 more, plus a second underwriting review.

What 0.25% is worth

Drop the permanent rate from 6.50% to 6.25% on the same $405,000 loan. The payment falls to about $2,494, saving roughly $66 per month, or about $23,800 over 360 payments. That’s why comparing wholesale options on the same loan matters: a quarter point is real money. Pricing differences between lenders can run either direction, so the only way to know is to compare.

Combined Loan Comparison: Broker Shelf vs. Single-Bank Offering

A single bank’s construction product can be competitive. If you already bank there, a relationship discount, a lender with in-house construction inspectors, or a program that fits your project can make it a strong choice. The limitation is structural: one bank shows you one rate sheet. A broker compares terms side by side.

FeatureDuane Buziak / Coast2CoastSingle-shelf lender (generic)Why It Matters
Lenders shoppedHundreds of wholesale lenders compared for your scenarioOne lender, one rate sheetConstruction pricing and guidelines vary widely, so more options means a better chance of a fit
Credit pull typeNoTouch Credit soft pull to pre-qualify, no hard inquiryOften a hard pull to pre-approveYou can test numbers on a lot and build without a credit hit
Construction-to-perm rate lockCompared across lenders, including lock length and extension termsOne lock policy, take it or leave itA lock that expires before the build ends can add cost
Program fitFHA, VA, and conventional options reviewed where offeredOnly the programs that lender offersThe right program depends on credit, down payment, and land equity
Dare to CompareBring any quote and see the wholesale alternativeNo comparison offeredYou see the market, not one offer

Dare to Compare

If you already have a construction quote from a bank, a builder’s preferred lender, or a credit union, Duane Buziak will review it and show you the wholesale alternative. If your existing quote wins, you’ll know it. If it doesn’t, you’ll see exactly where.

Building in Lynchburg and Central Virginia: Local Considerations

Lot conditions can change a budget more than any rate. Before you close on land, verify these items:

  • Utilities: Public water and sewer are available in parts of Lynchburg City and some adjoining areas. Many lots in Campbell, Bedford, and Amherst counties need a well and septic system, which add cost and require approvals.
  • Soil and perc tests: A lot that can’t pass a percolation test for septic may be unbuildable or require an engineered system.
  • Zoning and permits: Zoning, setbacks, and permit processes differ between Lynchburg City and each county, so confirm with the local planning office.
  • Access: Road frontage, shared driveways, easements, and grading on steep sites affect both cost and financing.

Appraisals on rural and hillside lots

The as-completed appraisal relies on recent sales of comparable new or newer homes nearby. On rural parcels or hillside lots, good comparable sales can be sparse, and appraisers may draw from a wider radius or adjust for views, acreage, and finishes. Ask your lender early how it handles thin comps, and use a builder whose past projects are documented.

Local data to watch

New-home activity is tracked by the U.S. Census Bureau’s Building Permits Survey, which publishes permit counts by state, county, and place. Reviewing recent permit activity for your county tells you how busy local builders and inspectors are, which can influence your timeline.

Duane Buziak works with active Lynchburg-area realtor relationships and can help connect you with local builders and agents familiar with building in the area. Lots near Blackwater Creek Trail or Peaks View Park draw buyers who want trails and green space close to town, but availability changes, so check what’s actually for sale rather than assuming.

Land and Construction Loan FAQ

1. Is a land and construction loan combined the same as a construction-to-permanent loan?

Often yes, though the terms overlap. A combined loan funds the lot and the build, and a construction-to-permanent loan converts to a mortgage after building. When both are in one single-close product, you get both features under one closing. Confirm with your loan officer whether the land purchase is included in the specific program.

2. Can I use land I already own as my down payment?

Usually, yes. Land owned free and clear can count as equity toward your down payment, based on its appraised value. If a balance remains on the lot, the loan typically pays it off and only your net equity counts. How much credit you receive varies by lender and program, so verify before relying on it.

3. Does a combined loan require a hard credit pull to pre-qualify?

Not with Duane Buziak. NoTouch Credit pre-qualification uses a soft pull with no hard inquiry, so you can see your options without a credit impact. Many single-shelf retail lenders require a hard pull to pre-approve. A full application later involves standard underwriting and credit review, as with any mortgage.

4. What happens if construction goes over budget?

The contingency reserve is meant to absorb modest overruns. Beyond that, you generally pay the extra from your own funds, because the loan amount is set at closing and can’t simply be increased mid-build. Some lenders allow limited adjustments with re-approval. Ask each lender how change orders and overruns are handled before you sign.

5. Can I use an FHA or VA loan for construction?

Possibly. FHA and VA construction-to-permanent options exist, but as of 2026 availability, credit minimums, and builder requirements vary by lender, and not every lender offers them. Duane Buziak can check which wholesale lenders offer them for your scenario. Confirm current guidelines with a licensed loan officer.

6. Do I pay interest on the full amount during the build?

No. During construction you pay interest only on funds that have been disbursed. Early on, that is mostly the land and a small first draw, so payments start low and rise with each inspected draw. Once the loan converts, payments are based on the full balance with principal and interest.

7. What if the build takes longer than my rate lock?

You may face an extension fee or a rate adjustment, depending on the lender’s terms. Lock lengths and extension costs vary, so ask before closing how long the lock lasts, what extending it costs, and whether a float-down exists. A realistic builder timeline plus a cushion is the safest planning approach.

8. Can I choose my own builder?

Often, yes, but the lender must approve the builder. Expect a review of the license, insurance, references, work history, and financial standing. Some lenders keep approved-builder lists or have stricter requirements for owner-builders. Check builder requirements early, before you sign a contract you may not be able to finance.

Bring Your Construction Quote to a Lynchburg Broker

One closing can cover both the lot and the build, and the savings from skipping a second round of fees and underwriting are real. What it costs you still depends on the rate, the lock terms, and the program, and those vary between lenders more than most buyers expect.

Bring any existing quote to Lynchburg Mortgage Broker by Duane Buziak for a NoTouch Credit pre-qualification and a Dare to Compare review. Schedule your free consultation today to explore loan options tailored to your goals, with no-impact credit pre-approval using VantageScore 4.0 and expert local guidance every step of the way. See your loan options without a single credit hit. Call (434) 443-7028.